• 0

Project Consultancy, Reports & Profiles

Why Do Entrepreneurs Start a Business?

Starting a business provides you with the opportunity to do something you're passionate about. Many individuals prefer to start a business since it gives them a sense of purpose. By carving out a path in an underserved niche, you can align yourself with new clients and partners and articulate your vision, purpose, marketing, material, attitude, and resources. 

Entrepreneurship liberates you from the monotonous paycheck that you'll earn at a job. As an entrepreneur, you'll have the freedom to express yourself by starting a business, and you'll be able to establish a no-limit profit cap. 

It gives you pride and a sense of achievement. Many people start a business with the dream of financial stability. One of the biggest reasons to start your business is you can make it as lucrative as you want with determination and hard work. There is no reason why you can't achieve your goal of building wealth. There are several financial benefits of starting your own business compared to working for a salary. 

 

Why start a Business in Arunachal Pradesh?

Available Resources:

With an area of about 8.4 million hectares, Arunachal Pradesh is the largest of the seven North-Eastern states of India and shares international borders with China, Bhutan, and Myanmar. Due to its geographic location, the state has ample opportunities for international trade with countries in South Asia. Agribusiness, weaving, art and crafts, cane and bamboo, horticulture, power, and mineral-related industries make up the state's primary industries. 

In India, Arunachal Pradesh has one of the highest potentials for generating hydropower. There are five river valleys with extensive hydropower potential totalling 50,328 MW, or 22 per cent of India's current electricity capacity. There are over 82% of evergreen forests in the state. The state boasts 601 species of orchids, over 500 types of medicinal plants, and rich flora and fauna. 

Agriculture makes up the bulk of the state's economy, which is dominated by terraced farming of rice and crops such as maize, millet, wheat, pulses, sugarcane, ginger, oilseeds, cereals, and potato.

 

Friendly Business Climate:

By fostering entrepreneurship and innovation culture, the Department of Promotion of Industry & Internal Trade, Startup India, the Government of Arunachal Pradesh, and the Department of Industries are nourishing a world-class start-up ecosystem. 

The state and the central government have provided several significant fiscal and policy incentives to develop thrust sectors in the state. Several such policies include the Public-Private Partnership Policy 2011, the State Industrial Policy 2008, and the Hydro Power Policy 2008. 

As per the Department for Promotion of Industry and Internal Trade (DPIIT), US$ 142 million worth of foreign investment has flowed into the northeast states between April 2000 and March 2021. Over the period October 2019 to March 2021, FDI worth $5.55 million was attracted to the state.

Construction of 598 km of roads at an estimated cost of Rs 1,100 crore has been approved by the Union Government. 

An allocation of Rs. 10 crores has been made for the Arunachal Pradesh Industrial Policy 2020, which provides financial, technical, and training assistance to youths interested in opening businesses. Because of the above and many other initiatives and policies, Arunachal Pradesh is considered one of the best places to start a business.

 

Ease of Doing Business in Arunachal Pradesh;

Because of its efforts to build an investor-friendly environment in the north-eastern state, the Arunachal Pradesh government ranked 29 in the national State Business Reform Action Plan 2018-19 - the 'Ease of Doing Business' annual rankings released by the government. Arunachal Pradesh moved up five spots from 2017-18 rankings, where it ranked 34th. The state is in the list of top 10 states that improved their Ease of Doing Business rating since 2015.

 

Steps to Starting your Business in Arunachal Pradesh

Private Limited Company Registration in Arunachal Pradesh:

In Arunachal Pradesh, company registration is a highly recommended way to start a business. Registration of companies provides limited liability to shareholders and a few restrictions on ownership. A Private Limited Company may have different directors from its shareholders. The Private Limited Company is recognized as an independent legal entity.

 

For the registration of a company in Arunachal Pradesh, the following documents are needed: 

·         For registering a Private Limited Company, the proposed directors' PAN card will be required. 

·         A proof of address that has the name of the Director should also be submitted, as well as the current address of the Director, which should be mentioned in the PAN. 

·         You will need to furnish a registered document of title to the property in the name of the Company or a notarized copy of the lease/rent agreement in the name of the Company, as well as a receipt for the rent paid that is less than a month old.

 

What is the procedure for registering an LLP in Arunachal Pradesh?

·         You need to follow these steps to register an LLP in Arunachal Pradesh: 

·         You can submit documents online by visiting the website or using the mobile app. 

·         Now, the process for obtaining the DSC begins. As soon as the DSC is received, one must verify the OTP. 

·         Submit a request to reserve the name of the LLP simultaneously. 

·         You will also need to upload a scanned and signed copy of your incorporation documents. 

·         The signed documents and the application are then sent to the Ministry of Corporate Affairs for approval, which takes between 2-5 days. 

·         A Bank account should be opened in the name of the LLP. Draft the deed of partnership for the LLP. Within 25 days of incorporation, the partners must sign this deed on stamp paper and upload it to the IndiaFilings platform. 

·         Upon incorporation, the engagement manager verifies the signed deed, which is then uploaded via the MCA Portal within 30 days.

AD_20Art21


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Business Plan of Copper Wire Manufacturing (Wire Drawing & Enameling)
Business Plan of Copper Wire Manufacturing (Wire Drawing & Enameling)

Copper is definitely stretched, molded, and shaped; is resistant to corrosion; and conducts heat and electricity effic... Read More

Capacity :
Copper Wire (0.914 to 0.376 mm): 350 Kgs / Day Enamelled Copper Wire (0.914 to 0.376 mm): 350 Kgs /
Plant and Machinery cost:
437.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
951.00Lakhs
Add To Inquiry Basket
Sanitary Napkin (Sanitary Pad) Manufacturing – Business Plan
Sanitary Napkin (Sanitary Pad) Manufacturing – Business Plan

Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. Technical textiles are defined as textile materials and... Read More

Capacity :
Sanitary Napkins: 16,800Pkts. / Day (Each Packet = 6 Pcs.)
Plant and Machinery cost:
42.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
244.00Lakhs
Add To Inquiry Basket
Recycled PET Polyester Fiber Manufacturing from used PET Bottles
Recycled PET Polyester Fiber Manufacturing from used PET Bottles

Polyester is popular because it resists stretch and wrinkles, provides flexibility and luxury, doesn’t shrink, a... Read More

Capacity :
Recycled Polyester Fiber: 5,000 Kgs / Day
Plant and Machinery cost:
73.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
353.00Lakhs
Add To Inquiry Basket
Business Plan of Maize Starch Production
Business Plan of Maize Starch Production

Maize also known as corn may be a cereal grain. Maize has become a staple food in many parts of the planet, with total... Read More

Capacity :
Maize Starch: 31 MT / Day Germ Bye Product : 5 MT / Day Gluten Bye Product : 3 MT / Day Husk/Bran By
Plant and Machinery cost:
1124.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2349.00Lakhs
Add To Inquiry Basket
Aluminum Ingots Manufacturing from Aluminum Scrap with Dross Processing
Aluminum Ingots Manufacturing from Aluminum Scrap with Dross Processing

Aluminium may be a chemical element. It’s a silvery white, soft, ductile metal. Aluminium is that the third most... Read More

Capacity :
Aluminium Ingots: 12.5 MT / Day
Plant and Machinery cost:
301.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1057.00Lakhs
Add To Inquiry Basket
Setup Plant of Super Absorbent Polymer (SAP)
Setup Plant of Super Absorbent Polymer (SAP)

A superabsorbent polymer (SAP) is a type of polymer that has the ability to absorb an... Read More

Capacity :
Super Absorbent Polymer 8,000 MT Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
2100.00Lakhs
Add To Inquiry Basket
Setup Business of Nano Resin Modified Bulk Composite for Dental Application
Setup Business of Nano Resin Modified Bulk Composite for Dental Application

 

Nano Resin Modifi... Read More

Capacity :
Nano Resin Modified Bulk Composite 2,000 Pcs Per Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
96.00Lakhs
Add To Inquiry Basket
Setting up Glass Fiber Reinforced Polymer (GFRP) Rebar Plant
Setting up Glass Fiber Reinforced Polymer (GFRP) Rebar Plant

 

Glass Fiber Reinforced Polymer (GFRP) rebar is an innovative construction material, engineered by embedding ... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm) 6 MT Per Day
Plant and Machinery cost:
211.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
549.00Lakhs
Add To Inquiry Basket
A Business Plan for Urea from Natural Gas
A Business Plan for Urea from Natural Gas

 

Capacity :
Urea Fertilizer 100 MT Per Day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
3300.00Lakhs
Add To Inquiry Basket
Start Production of Ferrotitanium Using Induction Furnace
Start Production of Ferrotitanium Using Induction Furnace

Ferrotitanium using induction furnace is a specialized process that involves the melting a... Read More

Capacity :
Ferrotitanium 70 2,500,000 Kgs Per Annum Ferrotitanium 40 2,500,000 Kgs Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
35.00 %
TCI :
0.00 Lakhs
Cost of Project :
1600.00Lakhs
Add To Inquiry Basket
Start Production of Biodegradable and Edible Tableware Products (for Animals) Using Rice Husk
Start Production of Biodegradable and Edible Tableware Products (for Animals) Using Rice Husk

Biodegradable and edible tableware products represent a remarkable fusion of innovati... Read More

Capacity :
Biodegradable and Edibile Tableware Products (Plate, Bowl & Cups) 72,000 Pcs Per Day
Plant and Machinery cost:
341.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
583.00Lakhs
Add To Inquiry Basket
Start Business of Sorbitol
Start Business of Sorbitol

Sorbitol is a type of sugar alcohol that is widely used as a sweetener in various foo... Read More

Capacity :
Sorbitol 6 MT Per Day
Plant and Machinery cost:
431.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
790.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Silicate from Silica and Soda Ash
A Business Plan For Sodium Silicate from Silica and Soda Ash

Sodium silicate, commonly known as water glass, is a versatile compound with applications acros... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
808.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Blood Bags
Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity :
Blood Bags 10,000 Nos per day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
1092.00Lakhs
Add To Inquiry Basket
A Business Plan For Nicotine From Tobacco Waste
A Business Plan For Nicotine From Tobacco Waste

Nicotine is a naturally occurring chemical compound that is f... Read More

Capacity :
Nicotine 100ml bottle each 3,500 Bottles per day
Plant and Machinery cost:
244.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
1662.00Lakhs
Add To Inquiry Basket
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal

An exhaustive manual that o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan Nonwoven Fabric For Mattress
A Business Plan Nonwoven Fabric For Mattress

 

Nonwoven fabric f... Read More

Capacity :
Nonwoven Fabric 400,000 Sq.mtrs. per day
Plant and Machinery cost:
797.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
2297.00Lakhs
Add To Inquiry Basket
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)

 

A variety of meth... Read More

Capacity :
-
Plant and Machinery cost:
276.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
878.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Semi Processed Canned Vegetable (Chickpeas & Red Kidney Beans)
Start Manufacturing Business Of Semi Processed Canned Vegetable (Chickpeas & Red Kidney Beans)

Semi Processed Canned Veget... Read More

Capacity :
Canned Chickpeas 1 Kg each 5,000 Th.Packs Per Annum Canned Red Kidney Beans 1 Kg each 5,000 Th.Pa
Plant and Machinery cost:
271.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
1398.00Lakhs
Add To Inquiry Basket
Business Plan For Silica From Rice Husk Ash
Business Plan For Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and... Read More

Capacity :
-
Plant and Machinery cost:
746.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1327.00Lakhs
Add To Inquiry Basket
Start Production of Activated Carbon From Bamboo
Start Production of Activated Carbon From Bamboo

 

Activated carbon ... Read More

Capacity :
Activated Carbon 750 MT per Annum
Plant and Machinery cost:
196.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
546.00Lakhs
Add To Inquiry Basket
A Business Plan For Light Weight Bricks (EPS Bricks)
A Business Plan For Light Weight Bricks (EPS Bricks)

Light weight bricks, also k... Read More

Capacity :
EPS Light Weight Bricks 200 Cu.Mt. Per Day
Plant and Machinery cost:
25.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
31.00 %
TCI :
0.00 Lakhs
Cost of Project :
737.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Carton Boxes
Start Manufacturing Business Carton Boxes

Carton boxes, also known as corrugated boxes, are commonly us... Read More

Capacity :
Carton Boxes 20 MT Per Day
Plant and Machinery cost:
213.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
1023.00Lakhs
Add To Inquiry Basket
Start Business Of Recycled Polyester Fiber From Used PET Bottles
Start Business Of Recycled Polyester Fiber From Used PET Bottles

Recycled polyester fiber is... Read More

Capacity :
Recycled Polyester Fiber 5,000 Kgs. Per Day
Plant and Machinery cost:
68.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
552.00Lakhs
Add To Inquiry Basket
A Business Plan  Copper Cathode From Copper Scrap
A Business Plan Copper Cathode From Copper Scrap

Copper cathode is a pure form of copper metal that is produce... Read More

Capacity :
Copper Cathode 1,800 MT Per Annum Copper Slag, Residue 180 MT Per Annum
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
954.00Lakhs
Add To Inquiry Basket
Start  Electrolytic Manganese Dioxide Business
Start Electrolytic Manganese Dioxide Business

Electrolytic Manganese Diox... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
Setup Sitagliptin (API) Business
Setup Sitagliptin (API) Business

 

Sitagliptin API, ... Read More

Capacity :
Sitagliptin 10 MT Per Day By Products 10 MT Per Day
Plant and Machinery cost:
377.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
5217.00Lakhs
Add To Inquiry Basket
Start Cardanol Business From Cashew Nut Shell Liquid
Start Cardanol Business From Cashew Nut Shell Liquid

Cardanol is a naturally occ... Read More

Capacity :
Cardanol 30 MT Per Day
Plant and Machinery cost:
186.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
710.00Lakhs
Add To Inquiry Basket
Start Business Of Cold Storage
Start Business Of Cold Storage

Cold storage refers to a me... Read More

Capacity :
Fruits, Vegetables, Pulses & Spices Store 5000 MT
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
713.00Lakhs
Add To Inquiry Basket
Start Layer Feed Production
Start Layer Feed Production

Layer feed is a specially formulated feed given to laying hens to ensure their ... Read More

Capacity :
-
Plant and Machinery cost:
234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1655.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Safety Shoes
Start Manufacturing Of Safety Shoes

Capacity :
Safety Shoes 2,000 Pairs Per Day
Plant and Machinery cost:
113.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
672.00Lakhs
Add To Inquiry Basket
Start IV Cannula Manufacturing Unit (Pen Style)
Start IV Cannula Manufacturing Unit (Pen Style)

An IV (Intravenous) Cannula, particularly the "Pen Style," is a medical device used for admini... Read More

Capacity :
-
Plant and Machinery cost:
1284.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
5103.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of  Disposable Plastic Syringes
Start Manufacturing Business Of Disposable Plastic Syringes

Disposable plastic syringes... Read More

Capacity :
-
Plant and Machinery cost:
245.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
1811.00Lakhs
Add To Inquiry Basket
Start Business of Solid Rubber Tyres
Start Business of Solid Rubber Tyres

 

Read More

Capacity :
-
Plant and Machinery cost:
1234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
4428.00Lakhs
Add To Inquiry Basket
Opportunity in Paint Rollers Business
Opportunity in Paint Rollers Business

 

Paint rollers are... Read More

Capacity :
Paint Roller 12,000 Pcs. Per Day
Plant and Machinery cost:
73.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
396.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Particle Board (Wood Base)
Start Manufacturing of Particle Board (Wood Base)

Particle board, also known ... Read More

Capacity :
Particle Board (Wood Based) 3,600 Nos Per Day
Plant and Machinery cost:
1630.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
3137.00Lakhs
Add To Inquiry Basket
Invest In Potato Starch & Flakes Industry
Invest In Potato Starch & Flakes Industry

Potato starch is extracted throug... Read More

Capacity :
Potato Starch: 7,000 Kgs Per Day Potato Flakes: 5,000 Kgs Per Day
Plant and Machinery cost:
203.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
877.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags- Biodegradable Compostable Carry Bag, Eco friendly Bag Production from Corn & Cassava Starch
Biodegradable Plastic Bags- Biodegradable Compostable Carry Bag, Eco friendly Bag Production from Corn & Cassava Starch

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation ... Read More

Capacity :
Biodegradable Plastic Bags from Corn Starch (Per Bag 25 gms Size): 6 MT / Day Biodegradable Plastic
Plant and Machinery cost:
1053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1768.00Lakhs
Add To Inquiry Basket
Production of  Bamboo Fabric, Tungsten Carbide Rod, Soyabean Products, Curcumin Extraction Unit, Red Oxide Primer, Ethanol, Red Iron Oxide, Sodium Chlorite Liquid from Powder
Production of Bamboo Fabric, Tungsten Carbide Rod, Soyabean Products, Curcumin Extraction Unit, Red Oxide Primer, Ethanol, Red Iron Oxide, Sodium Chlorite Liquid from Powder

 

Production... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Banana Wafers
Manufacturing of Banana Wafers

Manufacturing of Banana Wafers (Deep Fried Snack Food). Profitable Food Processing Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Used and Waste Oil Recycling Plant
Used and Waste Oil Recycling Plant

Waste oil is generated from industrial and non-industrial sources and primarily contains hydrocarbons. It’s goin... Read More

Capacity :
Used Lubricating Oil: 7,600 Ltrs / Day Spent Clay: 800 Kgs / Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
664.00Lakhs
Add To Inquiry Basket
Camphor Powder (Kapoor-Kapur) Making Business Plan
Camphor Powder (Kapoor-Kapur) Making Business Plan

Camphor (Cinnamomum camphor) is a white, crystalline substance with a powerful odor and pungent taste, derived from th... Read More

Capacity :
Camphor Powder: 3000 Kgs / Day
Plant and Machinery cost:
159.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
459.00Lakhs
Add To Inquiry Basket
Start a Disposable Plastic Syringes Manufacturing Business
Start a Disposable Plastic Syringes Manufacturing Business

Disposable Syringes are made from plastic material and are utilized in the sector of medical and veterinary science. because of their availability ... Read More

Capacity :
Disposable Plastic Syringes 1 ml Size: 720 Boxes / Day (Each Boxes = 100 Pcs) Disposable Plastic Sy
Plant and Machinery cost:
513.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
Brushless DC Motor (BLDC) Fan Production
Brushless DC Motor (BLDC) Fan Production

 

BLDC stands for Brushless DC motors. The BLDC motor may be a synchronous motor powered by a DC electric sour... Read More

Capacity :
BLDC Celling Fan (48"-52") : 1,000 Pcs. / Day
Plant and Machinery cost:
48.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Business Plan of Craft Beer (Microbrewery or Craft Brewery)
Business Plan of Craft Beer (Microbrewery or Craft Brewery)

A microbrewery or craft brewery may be a brewery that produces small amounts of beer (or sometimes root beer), t... Read More

Capacity :
Craft Beer (Bottles 650 ml Size): 18,462 Nos. / Day Craft Beer (Al. Cans 500 ml Size): 24,000 Nos. /
Plant and Machinery cost:
1366.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
4432.00Lakhs
Add To Inquiry Basket
Manufacturing of Wheat Starch & Gluten
Manufacturing of Wheat Starch & Gluten

Starch may be a polysaccharide present in staple food crops such as maize, potato, rice, etc. In India, it's tradition... Read More

Capacity :
Wheat Starch: 25 MT / Day Wheat Gluten: 6 MT / Day Bran, Fiber & Protein (Bye Product): 10 MT / Day
Plant and Machinery cost:
199.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
641.00Lakhs
Add To Inquiry Basket
Start Malic Acid (Powder) Production Business
Start Malic Acid (Powder) Production Business

 

Malic acid, also ... Read More

Capacity :
3.3 MT per day
Plant and Machinery cost:
391.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
1285.00Lakhs
Add To Inquiry Basket
Start your own Blood Lancet and Insulin Pen Needle Manufacturing Business
Start your own Blood Lancet and Insulin Pen Needle Manufacturing Business

Disposable blood lancet &am... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan on Hexamethoxymethyl Melamine Resin (HMMM)
Business Plan on Hexamethoxymethyl Melamine Resin (HMMM)

The chemical family of mela... Read More

Capacity :
8 MT per day
Plant and Machinery cost:
280.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
745.00Lakhs
Add To Inquiry Basket
Detailed Project Report on Cellulosic Cellophane Film
Detailed Project Report on Cellulosic Cellophane Film

CNF (cellulosic cellophane ... Read More

Capacity :
6 MT per day
Plant and Machinery cost:
310.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
681.00Lakhs
Add To Inquiry Basket
Setup E-Waste Recycling Plant
Setup E-Waste Recycling Plant

Electronic wastes are super... Read More

Capacity :
Plastic:1.28 MT/day Ferrous Material:0.80 MT/dayAluminium:0.56 MT/dayGlass:0.80 MT/day Copper:0.56 M
Plant and Machinery cost:
87.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
371.00Lakhs
Add To Inquiry Basket
Set up Bamboo Fiber and Yarn Manufacturing Unit A Complete Business Plan
Set up Bamboo Fiber and Yarn Manufacturing Unit A Complete Business Plan

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
The Abrasive Grinding Wheels Manufacturing Business Plan is the perfect way for you to start a business that Manufactures Abrasive Grinding Wheels
The Abrasive Grinding Wheels Manufacturing Business Plan is the perfect way for you to start a business that Manufactures Abrasive Grinding Wheels

It is a wheel made of bonded abra... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Lovastatin Production business  (from Dextrose, Peptone Powder, Sugar & Soyabean)
Start Lovastatin Production business (from Dextrose, Peptone Powder, Sugar & Soyabean)

Lovastatin is a drug that l... Read More

Capacity :
240 MT Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
2700.00Lakhs
Add To Inquiry Basket
How to Start Surgical Cotton Manufacturing Business
How to Start Surgical Cotton Manufacturing Business

Surgical cotton is also ter... Read More

Capacity :
1000 Kgs. per day
Plant and Machinery cost:
358.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
568.00Lakhs
Add To Inquiry Basket
Start Production Business of Industrial Enzymes used in Textile, Poultry and Paper Pulp Industries
Start Production Business of Industrial Enzymes used in Textile, Poultry and Paper Pulp Industries

Enzymes are great catalysts... Read More

Capacity :
300 MT Per Annum
Plant and Machinery cost:
633.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
959.00Lakhs
Add To Inquiry Basket
Setup Curcumin Extraction Unit
Setup Curcumin Extraction Unit

Turmeric is a gold-colored ... Read More

Capacity :
Curcumin Powder: 100 Kgs/day Turmeric Oil: 48 Kgs/day Deoiled Turmeric: 1,842 Kgs/day
Plant and Machinery cost:
215.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
493.00Lakhs
Add To Inquiry Basket
Tennis Rackets Manufacturing Business
Tennis Rackets Manufacturing Business

A tennis racquet is used to... Read More

Capacity :
400 Pcs Per Day
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
345.00Lakhs
Add To Inquiry Basket
Monosodium Glutamate Production Business
Monosodium Glutamate Production Business

Monosodium Glutamate (MSG):

Read More

Capacity :
15 MT Per Day
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2100.00Lakhs
Add To Inquiry Basket
Benzoic Acid or Sodium Benzoate Manufacturing Business
Benzoic Acid or Sodium Benzoate Manufacturing Business

 

Benzoic Acid:

Read More

Capacity :
Benzoic Acid:23.3 MT Per Day | Sodium Benzoate: 6.7 MT Per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
3400.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
PSA Oxygen Plant 30 to 36 cylinders per day 0.00 0.00
PSA Oxygen Gas Plant 180 to 200 cylinders per day 0.00 0.00
Production Business of Ra... Disposable Safety Razors: 864,000 Units per Day Razor Blade: 172,800 Units per Day Steel Scrap: 500 34.51 2285.00
Investing into Business o... 12 MT per Day 33.83 1135.00
Business of Disposable Sa... Razor Blade for Safety Razors Pack of 5 pcs each: 57,600 Units per Day Steel Scrap: 500 Units per Da 57.75 815.00
Emerging Business of Duct... 0 0.00 0.00
Extraction of Essential O... Lemon Grass Oil (10 ml Size Pack) 1,334 Ltrs per Day 34.60 607.00
Production of Bicarbonate... Bicarbonate Cartridge 720g 166.7 Nos. per day Bicarbonate Cartridge 650g 500.0 Nos. per day Acid Co 25.28 1153.00
Profitable Industry of Su... Surgical Methylated Spirit 1 Ltr Size Bottle 4,000.0 Nos. Per Day Surgical Methylated Spirit 5 Ltr S 27.53 265.00
Manufacturing of Rubber P... Rubber Powder 5.0 MT per day By Product Steel Wire 1.4 MT per day 26.98 191.00
Start extraction of Cashe... Cashew Nut Shell Oil 11.0 MT per day Cardanol 5.5 MT per day De-Oiled Cashew Nut Shell Cake (bye Pro 26.72 752.00
Setup a Manufacturing Pla... Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 50,000.0 Nos. per day D 30.78 345.00
Profitable Business of Di... 0 0.00 0.00
Investment Opportunities ... 0 0.00 0.00
Magnesium Stearate Magnesium Stearate 10.0 MT Per Day 44.00 515.00
Production of Bromelain E... 0 0.00 0.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
Cumin, Turmeric, Chilly &... 0 0.00 0.00
12345678910...

Showing 721 - 780 of 2695 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR